PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

Installed foam along the columns to protect the stone panels Facing South-West (800x600).jpg Installed formwork for the 3rd floor slab on deck Facing East (800x600).jpg Installed hangers for the electrical conduits at the 2nd Floor Facing West (800x600).jpg Installed overhead conduita at the 1st floor Facing East (800x600).jpg Installed vent piping at the Sprinkler Room Facing East (800x600).jpg Started installing 2 gas piping at the 1st floor Facing East  (800x600).jpg Started installing top metal track for the interior framing at the 2nd floor Facing South (800x600).jpg
Previous pageNext page Installed vent piping at the Sprinkler Room Facing East (800x600)
Installed vent piping at the Sprinkler Room Facing East (800x600)